This article is reprinted from the Speak Out Now healthcare newsletter at Highland Hospital in Oakland, CA.
Last week the power was out in the ACT for about 40 minutes. Thankfully the most necessary machines stayed on, and power was not down for long. But some important equipment, we learned, was not connected to a generator – will management learn from this lesson and be prepared for potentially longer power outages in the future?
Click here to read the article printed in the 11-12-25 Highland Healthcare Newsletter
